Schedule Downtime
Posted: Thu Nov 01, 2007 2:36 pm
I will be running an upgrade test on the DB server tonight in order to test a hardware upgrade path. This will be the final DB upgrade before I have to replace the entire server.
If the test goes well I'll order 2 new CPU's for the server which will move the server to it's max CPUs (Dual 1.4ghz PIIIs)
This will take less then 30 minutes. I've scheduled the downtime on the Calendar.
If the test goes well I'll order 2 new CPU's for the server which will move the server to it's max CPUs (Dual 1.4ghz PIIIs)
This will take less then 30 minutes. I've scheduled the downtime on the Calendar.